Ownership and action to end interference
Ending unauthorized use, recovery of the property and removal of the interference.
Protection of ownershipProperty, possession and neighbor actions provide different routes of protection where an immovable property is used without permission, a parcel boundary is crossed, actual use is obstructed, or a neighbor’s activity causes harm. Registered ownership, actually using a property and being affected by a neighboring property are not the same legal situation.
Güneş & Güneş Law Firm provides advice, representation of a party in mediation, acting as attorney for the claimant or the respondent, and enforcement of the decision in disputes over actions to end interference (elatmanın önlenmesi), compensation for unjust occupation (ecrimisil), protection of possession, rights of way and conduit, encroaching structures and neighbor relations. Land registry and cadastral records, the actual situation and technical review are assessed together.
Ending unauthorized use, recovery of the property and removal of the interference.
Protection of ownershipCompensation for use, the period and the calculation of the amount; disputes over use among co-owners.
Compensation for use and claimsRestoration of actual control, prevention of disturbance and applications under Law No. 3091.
Possession and time limitsBoundary measurement, structure built without right, demolition, compensation and restoration options.
Boundary and structure disputesAccess to the road, utility route, modification of an easement and use of water.
Passage and infrastructure rightsPrevention, preservation of evidence and compensation for noise, water leakage, excavation and structural damage.
Neighbor and damage reviewThe name of the action does not by itself show the right solution. Ending the interference, compensation for past use, remedying damage and creating a new easement are different claims. The same event may call for more than one route.
On a narrow screen, you can scroll the table horizontally to see the other columns.
| Situation you face | Legal route to be examined | Decisive issue |
|---|---|---|
| Your property is being used without permission | Action to end interference based on ownership; where the conditions are met, delivery, removal and compensation for unjust occupation. | The title deed, the legal basis of the use and the area of interference. |
| Your actual control has been taken away | Restoration of possession or prevention of disturbance; administrative protection in an appropriate case. | The event and the date of learning of it; the separate time limits of the judicial and administrative routes. |
| You are affected by a neighbor’s activity | Prevention, remedy and compensation based on neighbor law. | The limit of tolerance, the technical cause, and mediation as a condition precedent to litigation. |
| A wall or structure crosses the boundary | Boundary staking (aplikasyon) and on-site examination; options for an encroaching structure or a structure built without right: removal or compensation. | The legal boundary, good faith, timely objection and the value of the structure. |
| Road or utility connection is insufficient | Establishment of a right of way of necessity or of a right of conduit. | Technical necessity, alternative routes and appropriate compensation. |
| The problem lies in the registry, the housing complex or an administrative act | Separating the land registry/cadastre, condominium ownership or administrative application route. | The true subject of the claim, special legislation and the competent authority. |
In possession actions under Article 984 of the Turkish Civil Code (TMK), an application must be made within two months of learning of the act and the perpetrator and in any event within one year of the act. The general application period under Law No. 3091, by contrast, is sixty days from learning of the interference and in any event one year from the interference; statutory exceptions are assessed separately.
These periods do not apply as such to every action based on ownership. If there is a danger to structural safety, ongoing excavation or a short application period, report the situation without waiting for the documents to be completed.
Review the application periods and the distinction between routesIn these disputes, the assessment does not rest only on reading the title deed. Where the legal boundary and actual use diverge, who the interference comes from, when it began and which measure can be implemented are determined. The claim is framed within a scope that can be measured on site and implemented once a decision is made.
Matters requiring expertise in mapping, cadastre, construction, architecture, agriculture, valuation or the environment are selected according to the file. The firm does not prepare technical reports; it ensures that expert review explains the legal questions. The firm’s 22 years of experience in municipal legal practice contributes to assessing how permit and zoning files relate to the private-law dispute.
The position of owner, possessor, co-owner or user; the date of the event and any ongoing danger are determined.
The land registry, cadastre, permit and project file are compared with measurements, images and damage records.
Subject-matter and territorial jurisdiction, the parties and time limits are checked. The options of prevention, compensation, damages and easement are separated.
The need for mediation is assessed; in a suitable file, negotiation, an administrative application or litigation is pursued.
Fields of expertise and questions for the examination are determined; the measurements and reasoning of the reports are scrutinized.
Legal remedies, finality and enforcement conditions are examined; enforcement, land registry and remediation steps are followed.
By opening the relevant heading, you can see the legal scope, the decisive conditions and the points reviewed in preparing the file. All of the topics are part of the content of this page.
TMK Article 683 gives the owner the possibility to demand that unlawful interference be ended and to recover the property from anyone who holds it without right. The type and area of the interference with a plot of land, residence, business premises or agricultural land are determined concretely. If there is a valid right of use arising from a lease, easement, permission or statute, the assessment changes accordingly.
Preventing ongoing interference and recovering the compensation for past use are not the same outcome. The party, proof, value and court fee requirements of each claim are addressed separately.
Using a property is not unlawful occupation in every case. Tenancy, usufruct, habitation, superficies or right of way; allocation, a usage agreement and the scope of the permission given are examined. Withdrawal of permission, termination of the contract and a change of right holder may affect the legal nature of the use.
In acting as attorney for the respondent, the basis of the right, the actual area and period of use, the status of the party, good faith, errors in the report and the proportionality of the remedy sought are assessed. An action to end interference cannot be used as a shortcut around the conditions of eviction to end a valid lease. The protection routes of the holder of a limited real right and of the tenant are also determined according to their own legal bases.
Interference by a third party in a property is different from one co-owner excluding another from use. In co-ownership in shares, the share ratio does not by itself indicate sole ownership of a specific physical part; in joint ownership, the conditions of representation and disposition are examined separately.
If the aim is to end the co-ownership entirely, an action for dissolution of co-ownership is assessed separately. The existence of common ownership does not mean that every claim can be brought by the same persons and in the same procedure.
Use that crosses a boundary and an erroneous land registry or cadastral record are not the same problem. Current and past records, the basis of the registration, the cadastral sheet, the zoning implementation and the actual situation are compared. The need for a correction, for an action for cancellation and re-registration of title (tapu iptal ve tescil) or for annulment of an administrative act is determined accordingly.
Acquiring a property without a title deed by possession, or registration by acquisitive prescription, is subject to conditions separate from preventing an attack on possession. The nature of the property, its status as public property, forest or coast, the cadastral history and the special periods are investigated. Using a property for a long time does not automatically confer ownership of every property. Title annulment and registration services are a related area of work on this distinction.
Compensation for unjust occupation is the compensation that a right holder claims for use that does not rest on a valid right; it is not of the same legal nature as rent. Under TMK Article 995, bad faith, loss, and the fruits obtained or neglected to be obtained are taken into account.
The average of current listings does not by itself show the compensation for use in past years. Why the comparables are appropriate, and the adjustments for period and area, must be verifiable in the report. The claim of good faith and the right of use are also argued separately.
In compensation for unjust occupation between co-owners, as a rule the condition of exclusion from use (intifadan men) is examined, under which the other co-owner’s wish to benefit from the property or its income has been communicated. The content of the notice, its addressee, the date it reached the addressee and its proof matter; it cannot be said that a formal notice through a notary is necessarily required in every file.
Situations that can constitute exceptions, such as properties that yield natural or legal fruits, denial of the co-ownership, a usage agreement and earlier actions or applications, are assessed according to the specific case and current case law. Being an heir, or the other side using the property alone, does not by itself give rise to the same claim for all past periods. Representation and party requirements in a protection action and in a claim for compensation for unjust occupation are determined separately.
In established judicial practice, a five-year statute of limitations is applied to compensation for unjust occupation; the period claimed counted back from the date of the action, the plea of limitation and the grounds of suspension and interruption are assessed together. This is not a preclusive period that starts running from the same date in every case.
The claim period, area and amount must be set out clearly; the start date of interest, determination of the amount by an expert and the procedure for increasing the claim should be planned according to the file. Sending a formal notice does not, as a general rule, interrupt the statute of limitations by itself. A formal notice that has the effect of excluding the other co-owner from use or of putting the other side in default and a legal act that interrupts the statute of limitations must not be confused with one another.
The assessment notice or notification of compensation for unjust occupation that a public administration issues because of the use of a property is not the same as a compensation action between private persons. The administration that issued the act, the legal status of the property, the date of service, and the objection and litigation route are separated first.
The period of occupation, area of use, calculation of the prevailing value, payment and reduction, collection and eviction proceedings are examined under the relevant legislation. The effect of an objection to the administrative act or of payment on the time to bring an action is also checked separately; the periods in a private-law action do not apply directly. Keeping the service document and all pages of the notification is important for the first review.
Possession is actual control over a thing. In protection under TMK Articles 982–983, the prior actual situation and the unlawful interference matter; the final question of ownership is not always the subject of this action. Dispossession occurs as the taking of control, while disturbance occurs as interference with use while control continues.
Even a registered owner’s changing possession by force is not considered lawful in every case. The route of recourse must be determined instead of actual interference.
Under TMK Article 984, the right to bring an action arising from dispossession and disturbance lapses two months after the possessor learns of the act and the perpetrator and in any event one year after the act. The date of learning and the date of the event may not be the same; both should be documented.
This period cannot be used as the general period for an action to end interference based on ownership or for compensation for unjust occupation. It should not be assumed that the short period does not run merely because the interference continues. The effect of acts such as a prior application, a recurring act and mediation is examined separately according to the route chosen.
In interference with possession of an immovable, administrative protection under Law No. 3091 may be possible. The competent authority is the governor or a deputy governor designated by the governor for the central district, and the district governor (kaymakam) for other districts. Possession, the interference and the scope of the application are examined through an on-site inquiry.
The general application period is sixty days from learning of the interference and one year from the interference. The law provides an exception to the period for places under the authority and disposal of the state and for immovables whose benefit belongs to the public. An administrative decision does not finally resolve who owns the title; it does not replace a decision on compensation or registration.
If the dispute over the immovable is pending before a court at the time of an application under Law No. 3091, or if a related interim injunction exists, this affects the application of the law. Earlier decisions concerning the same immovable, parties and interference are investigated before the application; administrative and judicial routes are not pursued unaware of one another.
Judicial review of the administrative decision and a judicial action based on a claim of a better right are separate processes. The repetition of the interference after the decision is enforced may also have special consequences. The earlier decision, the service and the enforcement record therefore matter in a new application; contradictory statements about the same event must not be given to different authorities on the basis of incomplete information.
A wall, fence, row of trees or a line used for years may not coincide with the legal parcel boundary. An internet map and a real estate listing do not replace an official boundary staking. Under TMK Article 719, the title deed plan and the boundary marks on the ground are assessed together with the technical data.
A surveyor and cadastral expert explains the area of interference, the boundary line and the method of measurement. The result should be shown with a sketch and coordinates that can serve as a basis for the judgment. Cases in which the record must be corrected are distinguished from encroachment through use.
A structure located entirely on another’s land is different from one that partly crosses onto a neighboring parcel. TMK Articles 722–724 apply according to conditions such as to whom the materials and the land belong, consent, good faith, whether removal would cause excessive damage, and the ratio of the structure’s value to the land.
Removal, restoration to the original condition, an appropriate price or, where the conditions are met, the options of transfer of ownership are assessed separately. Having built the structure does not automatically confer ownership of the land. Permit, construction and payment records, correspondence between the parties and the information and objections at the time construction began matter.
In an encroaching structure under TMK Article 725, it is first examined whether there is an easement over the part that crosses the boundary. If there is no such right, the following carry weight together in a claim for an easement or for transfer of ownership against an appropriate price: the injured party’s failure to object within fifteen days of learning of the encroachment, the good faith of the person who built the structure and the necessity of the situation.
The passing of fifteen days does not mean in every case that a demolition claim has ended or that the land is automatically transferred. The measurement, the date of learning, good faith and the other conditions are made concrete. If construction is continuing, it is important to plan the objection and the preservation of evidence without delay.
For walls, fences, railings, ditches and similar boundary installations separating two properties, the presumption of common ownership under TMK Article 721, contrary evidence and special regulations are examined together. Whether the installation is actually on the boundary must be determined by technical measurement.
The location of the wall, maintenance and renewal costs, height, retaining function, use and the danger it creates may give rise to different claims. The contract, title deed, approved project and local rules are investigated. Unilaterally changing a boundary mark or a shared installation may create a new dispute and a problem of proof.
Under TMK Article 747, an owner who does not have a sufficient passage to the public road may demand a right of way from neighbors against full compensation. The claim is directed first at the most suitable neighbor according to the earlier ownership and road situation, and then at the property that will suffer the least harm. The interests of the parties are weighed together.
The shortest route is not always the most suitable route in legal terms. The decision must be capable of implementation in the land registry and on the ground.
The opening of a new road, the end of the need or a change in conditions may require the existing right of way to be reassessed. Registration, the purpose of its creation, the benefit of the right holder and the effect on the burdened property are examined together; a new road merely appearing on a plan may not show that sufficient access has actually been provided.
Changing the location of an easement and ending it entirely are subject to separate conditions. The relevant provisions, including TMK Articles 785 and 791, are assessed with the balance of benefit and cost. Closing off the existing passage before a court or settlement process is completed may give rise to claims for protection and compensation.
When a water, electricity, natural gas, sewage, drainage or communication line is run across another property, technical necessity, the suitability of alternatives and the harm to the neighbor are examined. The conditions of TMK Article 744 et seq. are distinguished from special public-law regulations.
A private-law easement is not the same as a public body’s authority of expropriation or to lay lines. Where the line actually runs must be measured as well as what the land registry shows.
Rain, drainage, spring and groundwater are not subject to a single regime. The natural flow between lands, the artificial redirection of water, rights over a spring and irrigation needs are handled, in addition to the provisions of the TMK, with the conditions of permits and special laws.
Accepting natural water that comes from higher land is not the same as directing wastewater or a concentrated flow onto a neighbor. Elevations, the drainage project, the seasonal situation and the source of the damage are investigated technically. Being close to a spring or well does not give an unlimited authority to draw water; the records and permits of the relevant institutions are also examined separately.
Under TMK Article 737, the criterion is not the existence of every nuisance but the exceeding of the ordinary limit of tolerance according to the condition and nature of the property and local conditions. The intensity, duration, repetition and source of the effect are made concrete.
A log of events, measurements, records and lawfully obtained images are assessed. The solution may be insulation, relocation, a working schedule, remedy or cessation. It is not necessary to shut down the activity entirely in every case.
The existence of a building or business permit does not by itself remove the private-law claims arising from neighbor law. A violation of the permit likewise does not by itself require every claim for compensation or demolition to be accepted. The administrative permit and the effect on the neighbor are examined separately.
A change in view, light or air flow does not constitute an absolute prohibition in every case. The location of the properties, the purpose of use, zoning conditions and the severity of the effect are decisive. Under TMK Article 730, the remedy regimes for excessive use and for unavoidable effects consistent with local custom are also distinguished.
TMK Article 740 regulates the application to the neighbor and the conditions of remedy within an appropriate time for branches and roots that cross the boundary and cause harm. Overhanging branches do not all give rise to the same degree of harm or the same right to cut; proportionality, the health of the tree, protection status and local regulations are assessed.
Damage to structures or installations, shading, the danger of falling and agricultural effects are determined by expert review when necessary. Cutting the whole tree and removing the part that crosses the boundary are not the same act. Determining the legal conditions and safe practice first reduces the risk of later damage and liability.
In a dispute concerning an independent unit, roof, common installation, balcony, terrace or car park, the field of application of the Condominium Ownership Law and the general rules of neighbor law is separated. The management plan, approved project, board decisions and the common or private nature of the installation matter.
In water leakage, the source may be a unit, a common line, insulation or a structural defect. Directing a claim only at the person living on the floor above is not sufficient to identify the right party. The position of the management, the owner, the user and others who may be responsible is investigated. The check of jurisdiction and mediation is made according to the true basis of the claim; detailed work is handled within the scope of condominium ownership disputes.
When a neighbor’s excavation, demolition or construction causes cracks, subsidence, ground slip or flooding, it is important to document the existing situation without delay. Within the framework of TMK Article 738 and the related liability provisions, the support of the structure, shoring and retaining, drainage and the method of work are examined.
In case of danger to life safety, the application to the competent emergency units must not be delayed. While emergency safety measures are taken, evidence that can safely be preserved is protected. A repair invoice alone does not always prove which activity caused the damage.
Preservation of evidence under Article 400 et seq. of the Code of Civil Procedure (HMK) protects findings that may disappear or become difficult to present later. An interim injunction, by contrast, provides interim legal protection under the conditions of HMK Article 389 et seq. One does not replace the other; an injunction is not granted automatically and security may be required.
The competent authority and the procedure of the request may differ before and after the action is filed. The area of interference, measurement, damage, cause and preventive method are put to the court-appointed expert as specific questions. On service of the report, the two-week objection period under HMK Article 281 is observed as a rule; grounds such as incomplete review, contradiction and erroneous calculation are explained.
Actions concerned only with the protection of possession are heard by the civil court of peace (sulh hukuk mahkemesi) under HMK Article 4; actions to end interference based on ownership and claims based on the general provisions are as a rule heard by the civil court of first instance (asliye hukuk mahkemesi). The Condominium Ownership Law, lease and other special regulations are also checked separately. In actions concerning real rights in an immovable and its possession, the exclusive territorial jurisdiction under HMK Article 12 is observed; the same rule does not apply to every monetary claim.
In disputes arising from neighbor law and the Condominium Ownership Law, mediation is a condition precedent to litigation under Article 18/B of Law No. 6325 on Mediation. The parties being neighbors alone does not bring all claims to end interference or for compensation for unjust occupation within this scope. In settlements under this article, an enforceability endorsement is mandatory; the formal and registration requirements of settlements involving the transfer of an immovable or an easement are also observed separately.
The liability of the owner of an immovable under TMK Article 730 and a defect in a building or lack of maintenance and the risk of damage under Articles 69–70 of the Turkish Code of Obligations (TBK) are examined separately. In the specific file it is determined for what reason the owner, the holder of a usufruct or right of habitation, the tenant, the operator, the contractor or the technical person responsible is liable, and what the time limits for compensation are. In general tort compensation, the two years from learning and ten years from the act under TBK Article 72, together with the exception of the longer criminal statute of limitations, are taken into account; ongoing interference, special regulations and the nature of the claim are examined separately.
The scope of the decision, the availability and period of the legal remedy, the requirement of finality and the method of enforcement are assessed together. The same application is not accepted for a dispute over a real right in the land registry, for merely the removal of interference, for registration and for a monetary claim. A cassation appeal, or enforcement before the decision becomes final, cannot be promised automatically for every decision.
The structure to be removed, the area of interference, the width of the passage, the route and the work to be done must be shown unambiguously in the judgment. The consistency between the sketch and the decision, the land registry transaction, enforcement costs and the technical implementation are planned. In repeated interference, the scope of the existing judgment and the need for a new application are examined separately.
At the start of a file, the likelihood of litigation alone is not explained. The aim of the claim, the need for proof and the workable solution are assessed together; depending on the scope of the matter, the headings below are clarified with the client.
Protection of ownership, restoration of use, compensation, remedying of damage or the need for an easement.
The approaching time limit, the ongoing danger and the evidence that must be preserved first.
The evidentiary, cost and enforceability aspects of settlement, administrative application and litigation routes.
The scope of the engagement, sharing of documents, notification of developments and the next step.
You can start with the documents you have; not every file requires the whole of this list. Preserve the documents as they are rather than rearranging them later or replacing the originals.
Province/district, block and parcel numbers and independent unit; the current title deed and encumbrances, inheritance, lease, use or easement documents.
The start of the interference, the date of learning, the perpetrator, the area used and whether it is continuing; dated images and witness information.
Survey plan, boundary staking, cadastral sheet, permit, project, zoning and division records; any existing engineering, measurement or damage report.
Formal notices and service documents; applications to law enforcement, municipal police, the municipality or under Law No. 3091; mediation, court, expert and earlier decisions.
Rent and produce data, repair invoices, insurance and payment records; the co-owners’ pattern of use, representation and foreign document information.
It is important to create a record before the source of the damage is closed, a boundary mark is changed or a structure is removed. Avoid collecting records or images unlawfully and entering the neighboring property without permission. If there is an urgent safety need, do not postpone applying to the competent units in order to collect evidence.
Güneş & Güneş Law Firm was founded by attorney Umut Güneş in Kemer on March 18, 1999 and moved its headquarters to Antalya in 2007. Advice, representation in mediation, litigation, legal remedies and enforcement of the decision can be planned in files in all 81 provinces of Türkiye, taking into account the location of the property, subject-matter and territorial jurisdiction, on-site examination and conditions of representation.
In residences, plots, agricultural land, business premises and tourism properties in Antalya, the land registry and cadastre, municipality, zoning, permits and actual use are assessed together. In files elsewhere in Türkiye, the necessary on-site review and the organization of hearings are determined according to the scope of the matter.
In disputes connected with Türkiye, communication in Turkish, English, German and Russian; online meetings and appropriately secure sharing of documents can be provided. The authority of a foreign company to represent, power of attorney, apostille/certification, translation, special authority and service abroad are checked for the specific file. The applicable law, international jurisdiction and enforceability of the decision are also assessed separately.
The attorney’s fee is determined in writing together with the type of claim, the stage of the file, technical review, counterclaims and the scope of representation. Court fees, on-site examination, court-appointed expert, service, expert opinion, translation and possible security are items separate from the attorney’s fee.
Which of litigation, administrative application, mediation, legal remedies and enforcement of the decision are included in the engagement is explained. The result and the duration depend on the other side’s stance, the records, the evidence and the actions of the competent authorities. Without a concrete review, no exact cost or end date is given.
It is filed to end interference that does not rest on a valid right. Delivery of the property, removal of a structure and the compensation for past use are assessed as separate claims.
Different routes of protection may exist based on possession, a lease or a limited real right. Which right has been violated and the claimant’s status are determined with documents.
A valid lease and the conditions of eviction are examined separately. Describing the use as unjust occupation does not remove the rules of lease law on termination and eviction.
No. Compensation for unjust occupation is compensation for use without a justified reason; a rent claim rests on a contract. The nature of the relationship of use changes the period and the calculation of the amount.
The same condition is not required in every file. Exclusion from use between co-owners and its exceptions, permission to use, default and proof of notification are assessed separately.
In practice, a five-year statute of limitations is applied. The claim period, the plea of limitation and acts affecting the period are examined; this is not a preclusive period that applies automatically in every file.
For TMK Article 984, the date on which the act and the perpetrator became known matters; there is also an outer limit of one year from the act. The dates must be documented and the application must not be delayed.
Administrative protection under Law No. 3091 concerns possession. It does not replace a final determination of ownership, land registration or compensation; pending actions and injunctions are also examined.
The effect of the routes on one another must be checked. In particular under Law No. 3091, a dispute pending before a court and an interim injunction may affect acceptance of the application.
It is a condition precedent to litigation in disputes arising from neighbor law and falling within Article 18/B of Law No. 6325. Not every immovable property action falls within the same scope merely because the parties are neighbors.
No. Actions solely for the protection of possession and claims based on ownership are distinct. The Condominium Ownership Law, lease and special statutory provisions are also assessed separately.
On its own it does not replace an official boundary staking and expert measurement. The title deed plan, cadastral sheet, coordinates and use on the ground must be compared.
First the legal boundary and the encroaching area are measured. Depending on the nature of the structure, ending the interference, removal, restoration to the original condition or other options are assessed.
No automatic transfer takes place. Under TMK Article 725, good faith, the date of learning or objection and the other conditions are examined together. Timely assessment is therefore important.
A permit does not by itself remove private-law liability. The interference, the damage, the limit of tolerance and the necessary technical measures are assessed separately.
It is not sufficient in every case by itself. The location, zoning conditions, the nature of the property and the effect are assessed; a claim is not framed on the assumption of an absolute right to a view.
The conditions of harm, application and appropriate time, and the protection status of the tree must be examined. Cutting the whole tree and removing the part that crosses the boundary are not the same authority.
No. The need for sufficient access, the earlier road and ownership situation, alternatives, least harm and compensation are weighed together. The shortest road is not always chosen.
It is determined whether the source is an independent unit, a common installation, insulation or a structural defect. The owner, user, management and other responsible persons are assessed accordingly.
If there is a risk to life safety, apply to the competent units. Preserve dated records in a safe way, and assess without delay the need to have the cause of the damage and the current situation established.
Not on its own. Preservation of evidence protects the existing findings; for a stop or other temporary protection, the conditions of an interim injunction are examined separately.
It is possible. The area, route, remedy, price, schedule and security are defined clearly; if a real right or an immovable transaction is involved, the formal, annotation and registration requirements are completed.
Transactions in Türkiye can be carried out with properly executed documents of representation. The conditions for the power of attorney, special authority, foreign documents and service are checked from the start.
On-site examination, expertise, the number of parties and services, counterclaims and legal remedies are decisive. Duration and costs are explained with their scope after the file is reviewed; no definite date for the result can be given.
Content preparation and source check: . The basic regulations below are assessed together with the special provisions that may apply to the specific case and with current court decisions.
Briefly describe the province or district where the property is located, your position as owner or user, and what the interference is. State the date of the event or of learning, any ongoing danger and any time-limited notification in your first communication.
Our target for a first response is 48 hours. This period does not mean that a legal opinion has been completed or that the matter has been accepted. If you have an urgent action date, please notify us by phone.
Monday – Friday, 09:00 - 18:00
This page is for general information; it does not constitute a personalized legal opinion or an assurance of an outcome. The outcome depends on the specific facts, records, evidence, the claims and defenses of the parties, expert review and the assessment of the competent authority. An attorney–client relationship is established upon confirmation of acceptance of the matter and of the engagement.