FROM CONTRACT TO DELIVERY, FROM PROJECT TO DISPUTE

Construction Law

Legal advisory services and litigation follow-up in construction contracts, projects in return for a land share, incomplete and defective works, delivery delay and progress payment claims.

SCOPE OF SERVICES IN CONSTRUCTION LAW

Contract, technical record and legal claim together

Construction law addresses together the contract, title, permit, technical scope, price, time and delivery relationships of a project. Güneş & Güneş Law Firm provides legal support to landowners, project owners, contractors, developers, investors, buyers of independent units, subcontractors, suppliers, architects and engineers.

The review can extend from the start of the project to its delivery and acceptance and, in the event of a dispute, to the pursuit of receivables, compensation, termination of the contract and liquidation. The contract and the actual works, the technical specification, the work schedule and the payment records are assessed within the same framework.

ADVISORY, TRANSACTIONS AND REPRESENTATION

Our practice areas in construction law

Depending on the stage of your project or the subject of the dispute, you can go to the relevant group and open the details of each heading.

Contract and project structure

Construction and work contracts

Provisions on scope, price, time, acceptance and liability in work, turnkey, design–build and EPC models.

Show the scope of services — Construction and work contracts

Provisions on scope, project and technical specification, price, lump-sum price or unit price, work schedule, site handover, progress payment (hakediş), variation order, extension of time, delivery and acceptance, defects, security, insurance, contractual penalty, termination and dispute resolution are prepared and reviewed in a manner specific to the project. Turnkey, design–build, engineering–procurement–construction (EPC) and project management models are structured according to the nature of the work.

Basic Matters to Be Regulated in Construction Contracts

A construction contract should not be created by adding the project name to a ready-made text. Depending on the nature of the work, at least the following matters should be regulated in a clear, measurable and verifiable manner:

  • Identity of the parties, representation and signing authority
  • Land and title deed records and existing encumbrances
  • Scope of the work and works outside the scope
  • Contract documents and their order of precedence
  • Project, technical specification, room finish schedule and material standard
  • Lump-sum price, unit price, cost-plus fee or mixed price model
  • Taxes, fees, Social Security Institution (SGK), permit, utility subscription and other financial burdens
  • Site handover, commencement of the work and work schedule
  • Interim milestones, delivery and the obligation to obtain the occupancy permit
  • Progress payment, advance payment, deductions, retention and final account
  • Price adjustment (fiyat farkı), adaptation and extraordinary cost changes
  • Additional work, omitted work and variation order procedure
  • The project owner’s approval and payment obligations
  • The contractor’s organization, personnel and subcontractor obligations
  • Inspection, testing, sampling, quality and acceptance system
  • Occupational health and safety and environmental obligations
  • Delay, contractual penalty, loss of rent and other damages
  • Apparent and latent defects, notice, remedy and warranty periods
  • Insurance, letter of guarantee, suretyship, mortgage and other security
  • Suspension, termination, rescission and liquidation
  • Force majeure and the procedure for extension of time
  • Confidentiality, intellectual property rights, data and project documents
  • Notification, KEP, meeting and site correspondence arrangements
  • Mediation, court or arbitration route

Even if the technical details are regulated in a separate technical specification, it should be stated expressly that this specification is an annex to the contract and a binding part of it. Where the implementation details of the project will be determined later, the decision and approval mechanism should be established in the main contract.

Pre-project risk review

Joint review of title, zoning, permit, contractor capability, financing and security before the investment.

Show the scope of services — Pre-project risk review

The land and title deed, zoning capacity, obtainability of the permit, project and ground data, the contractor’s authorization certificate and technical and financial capability, financing, sales model, estimated cost and security structure are reviewed. Before an investment or contract decision, a legal risk report can be prepared within the agreed scope of review; areas that require technical and financial review are reported by the relevant experts and included in the legal assessment.

Legal and Technical Documents Should Be Reviewed Together in a Construction Project

A construction dispute cannot be resolved through the text of the contract alone. What expressions such as “turnkey,” “in accordance with the technical specification,” “complete delivery” or “works forming the basis of the progress payment” in the contract mean must be compared with the project, quantity take-off, room finish schedule, item description, work schedule, site records and the actual works.

At the beginning of the project, the consistency of the following documents with one another should be checked:

  • Title deed record, cadastral extract (çap), staking-out survey (aplikasyon) and zoning status
  • Soil survey and geological–geotechnical data
  • Architectural, structural, electrical and mechanical projects
  • Construction permit and the approved projects annexed to the permit
  • Contract, technical specification and room finish schedule
  • Quantity take-off, cost estimate summary, unit price or lump-sum price scope
  • Work schedule, critical delivery dates and interim milestones
  • Progress payment and payment method
  • Change of work and additional work procedure
  • Construction inspection and laboratory records
  • Security, insurance and warranty arrangements
  • Provisional acceptance, final acceptance, delivery and defects procedure

The order of precedence among the documents should be set out clearly in the contract. Otherwise, according to which document a conflict among the drawing, specification, quantity take-off and offer is to be resolved may itself become a subject of dispute.

Project and claims management

Follow-up of the work schedule, variation orders, extension of time, additional work and contractual notices throughout the project.

Show the scope of services — Project and claims management

The work schedule, progress payment, variation order, extension of time, additional work, quality, delivery and contractual notices are followed while the project is ongoing. Legal support is provided so that site meetings and correspondence are kept in an order that will prove any progress payment or delay claims that may arise in the future.

Construction in return for a land share

Sharing, staged title transfer, security, independent unit standard, occupancy permit and conditions for sales to third parties.

Show the scope of services — Construction in return for a land share

The sharing between the landowner and the contractor, independent units, land shares, transfer schedule, security, power of attorney, permit, project change, delivery, occupancy permit, common areas, sales to third parties and the termination of the contract are regulated in detail. Disputes over registration, termination, liquidation and compensation arising from existing contracts are handled.

Construction Contracts in Return for a Land Share and Title Security

A construction contract in return for a land share is a contract of a mixed nature that combines the contractor’s obligation to construct a building with the landowner’s obligation to transfer a land share or independent unit, and that involves the transfer of immovable property. The formal requirement, the timing of share transfers and the level at which the contractor has performed its obligation are decisive for title deed claims.

The following risks in particular should be managed in the contract:

  • All of the landowners and their share ratios
  • Authority problems arising from inheritance, family residence, guardianship or company representation
  • Mortgage, attachment, annotation, usufruct and other encumbrances
  • Zoning capacity and a project for which a permit can be obtained
  • Independent unit list, location, net–gross area and land shares
  • Linking share transfers to construction levels
  • The contractor’s authority to sell and assign to third parties
  • Security mortgage, bank guarantee or controlled transfer of shares
  • Project change and the emergence of additional independent units
  • Delivery standard of the independent units belonging to the landowner
  • Permit, servitude of floor ownership (kat irtifakı), condominium ownership and the obligation to obtain the occupancy permit
  • Delay compensation, loss of rent and contractual penalty
  • Remedying incomplete and defective works
  • Termination of the contract and liquidation of the works carried out
  • The position of third parties who acquire independent units from the contractor

Granting the contractor broad title or sales authority at the outset may reduce the landowner’s security before the project is completed. On the other hand, a predictable transfer mechanism may be needed so that the contractor can obtain financing and make sales. The contract should balance these two interests with a system that is tied to the project stages, verifiable and secured.

Revenue and proceeds sharing

Regulating the contributions of land, financing and sales through minimum revenue, audit of accounts and liquidation provisions.

Show the scope of services — Revenue and proceeds sharing

In structures based on land, financing, project development, sales and revenue sharing, the parties’ contributions, sales authority, audit of the accounts, minimum revenue, marketing, project cost, security and liquidation provisions are regulated.

Project ventures and companies

Contribution, management, representation and liability arrangements in a project company, simple company, joint venture and consortium.

Show the scope of services — Project ventures and companies

In projects involving more than one investor, contractor or technical participant, the common purpose, contribution and financing obligation, management and representation, division of work, joint liability, decision-making, share transfer, exit, default and liquidation are regulated. The contractual and tax consequences of a project-specific company, simple company (adi ortaklık), joint venture or consortium model are assessed together.

Works, delivery and receivables

Incomplete and defective works

Separating works not carried out from faulty works; notice, remedy, price and compensation claims.

Show the scope of services — Incomplete and defective works

The building’s non-conformity with the contract, the approved project, the technical specification or the rules of science and art is reviewed. Claims arising from the completion or price of incomplete work are separated from claims arising from defective work. Repair, price reduction, rescission of the contract if the conditions are met, and compensation are assessed. The legal basis and feasibility of a demand for reconstruction are examined separately on the basis of the type of contract, the nature of the defect and technical necessity. Apparent and latent defects, gross negligence, and the obligations of inspection and notice are addressed together.

Incomplete and Defective Construction Works

Incomplete work is the contractor’s failure to carry out, at all or in full, a work it undertook in the contract. Defective work is work carried out that does not conform to the contract, the project, the technical specification, the agreed quality or the intended use. This distinction is important in the assessment of delivery, notice, elective remedies, price and the statute of limitations.

The following comparisons are mainly made in the technical review:

  • The contract and the actual works
  • The approved project and the actual condition
  • The room finish schedule and the materials used
  • The structural, mechanical and electrical project and the implementation
  • The quantity take-off and the quantity realized through progress payments
  • The construction permit and the occupancy permit
  • Technical standards, manufacturer’s instructions and the rules of science and art
  • The delivery condition of common areas and independent units

In a contract for work, after delivery, inspection as soon as the ordinary course of business allows and notice of defects within a reasonable time are important. A defect that appears later must be notified without delay. Under Article 475 of the Turkish Code of Obligations (TBK), repair, price reduction or, if the conditions are met, rescission are examined, in addition to compensation. If removing the work on the project owner’s immovable property would cause excessive loss, the limitation on the right of rescission is taken into account. The elective remedies and time limits in consumer transactions are assessed separately.

For defects in the load-bearing system, waterproofing, facade, roof, foundation, installations, fire safety, elevator, pool or common areas, a technical panel should be formed by separating the fields of expertise. The legal claim should be based on a verifiable technical finding and cost calculation.

Notice of defects and the statute of limitations for bringing an action are different. TBK Article 478 provides a five-year period running from delivery for defective immovable structures and a twenty-year period if the contractor is grossly negligent. Incomplete work, the price receivable, consumer transactions and other grounds of liability are not accepted as subject to the same period. The starting date, the regime to be applied and the events affecting the period are reviewed according to the file.

TBK Arts. 474–478 · Consumer transactions

Late delivery and delay

Loss of rent, loss of use and contractual penalty depending on the delivery date, extension of time and the cause of the delay.

Show the scope of services — Late delivery and delay

The site handover, start of construction, interim milestones, and the delivery and occupancy permit dates are reviewed together with extension of time, force majeure, delay attributable to the project owner and the contractor’s default. Claims for loss of rent, loss of use, delay penalty and other damages are determined according to the specific contract.

Delivery Delay, Extension of Time and Compensation

The delay calculation should not be made only from the delivery date on the calendar. The site handover, permit and project approvals, the project owner’s payments and decisions, variation orders, force majeure, administrative suspension, supply conditions and the contractor’s work schedule are reviewed together.

The following matters need to be clear in the contract:

  • The event from which the start of work and the delivery date will run
  • The distinction between calendar days and business days
  • Interim milestones and the critical path
  • Grounds for extension of time
  • The period for notice and for submitting documents
  • The calculation of the delay penalty and its upper limit
  • Loss of rent or loss of use
  • The relationship between the contractual penalty and damage exceeding it
  • Termination if the delay exceeds a certain level
  • Acceleration and recovery programme

It is not sufficient merely to write the expression “force majeure.” That the event is beyond the parties’ control, its effect on the performance of the obligation, the mitigation of the loss, timely notice and the causal link must be examined on the specific facts.

Progress payments and contractor receivables

Price claims through quantity take-off, measurement sheets (ataşman), price adjustment, deductions, retention and final account.

Show the scope of services — Progress payments and contractor receivables

Interim and final progress payments, quantity take-off, measurement sheets, unit price, price adjustment, deductions, retention, offset of advance payments, withholding tax, final account and the balance of the work price are reviewed. The pursuit of unpaid contractor or subcontractor receivables through mediation, litigation, arbitration and enforcement is carried out.

Progress Payment, Quantity Take-Off, Additional Work and Final Account

In a progress payment dispute, whether the work falls within the scope of the contract and the pricing method are decisive as well as the quantity of work carried out. Unapproved additional work, oral instructions, revised projects, mandatory changes on site, and whether the signed progress payments contain a reservation of rights (ihtirazi kayıt) are assessed together.

In the review:

  • Offer and price schedule
  • Item descriptions and unit price analyses
  • Quantity take-off, measurement sheets and as-found survey (röleve)
  • Site instructions and meeting minutes
  • Interim progress payments and payment records
  • Deductions, advance payments and security offsets
  • Price adjustment or adaptation provisions
  • Final account and release records
  • Invoices and commercial books

are considered together. Just as the signing of a progress payment may not mean that every element in the document is final in every case, acceptance without a reservation and payment conduct may also affect the proof of the claim.

Additional work and price disputes

The effect of a change of scope, work outside the contract, a revised project and cost increase on price and time.

Show the scope of services — Additional work and price disputes

The effect on price and time of work outside the contract, a change of scope, an increase or decrease in work, a revised project, a change of materials, the owner’s instructions and extraordinary changes in economic conditions is assessed. Changes are made subject to written records and authorized approval.

Termination, rescission and liquidation

Joint planning of the breach, formal notice (ihtar), additional period, level of works, title, security and completion of the project.

Show the scope of services — Termination, rescission and liquidation

The contractor’s failure to start the work, abandonment of the work, delay or defective performance; the project owner’s breach of its payment or cooperation obligations, exceeding of the approximate price, impossibility and other grounds for termination are examined. The consequences of the termination of the contract, with effect for the future or retroactively, on title, works, receivables and the rights of third parties are determined.

Termination of the Contract and Liquidation of the Project

Terminating a construction contract does not consist only of drafting a “termination notice.” The percentage of completion of the building, usability, defects and deficiencies, title transfers, the rights of third parties, the materials and equipment on site, progress payments, security and the method of completing the project must be planned together.

Before termination:

  • The nature of the breach and whether it can be remedied
  • Whether a formal notice and an additional period are required
  • The level of completion of the work
  • The economic and technical value of the existing works
  • The cost of incomplete and defective work
  • The contribution of the project owner or the contractor
  • Reversal of title and share transfers
  • Acquisitions by third parties
  • Cashing in or return of securities
  • The cost of completion with a new contractor
  • Preservation of evidence and handover of the site

should be assessed. The level of completion and the specific contract may change the retroactive or prospective consequences of termination.

Landowner–contractor disputes

Sharing of shares and units, power of attorney, project change, permit, delivery and termination of the contract.

Show the scope of services — Landowner–contractor disputes

Legal proceedings are conducted on the sharing of independent units and land shares, delay, incomplete work, non-conformity with the project, use of the power of attorney, transfer to third parties, permit and occupancy permit, delivery and termination of the contract.

Subcontractors and suppliers

Subcontractor scope, delivery of materials, progress payments, defects, delay, security and recourse among the parties.

Show the scope of services — Subcontractors and suppliers

The subcontractor scope, owner approval, coordination, progress payment, defects, delay, delivery of materials, security, recourse and sharing of liability are regulated; receivable and compensation disputes are followed.

Title and protection of receivables

Prepaid housing and sales off the plan

Promise to sell, form of contract, permit, payment, delivery, withdrawal, rescission and the assessment of consumer legislation.

Show the scope of services — Prepaid housing and sales off the plan

In sales made from a model or while construction is ongoing, the form of the contract, the description of the independent unit, the payment plan, delivery and transfer, project change, the security system, withdrawal or rescission, and provisions on delay and defects are reviewed. In sales that qualify as consumer transactions, the mandatory consumer legislation applies in addition.

Prepaid Housing and Off-the-Plan Sales Disputes

Where a consumer acquires an immovable property for housing purposes by paying the price in advance, the mandatory provisions of consumer legislation may apply alongside the Turkish Code of Obligations and property law. Before the contract is concluded, the construction permit, the capacity of the seller and the landowner, title deed encumbrances, the security system, and the description of the independent unit in the project and sales documents should be reviewed.

The main disputes are:

  • A contract that does not comply with the official form
  • Sale without a construction permit
  • Delay in delivery and title transfer
  • Changing the project, the independent unit or the common areas
  • Differences between net and gross area
  • Incomplete and defective delivery
  • The consumer’s request for withdrawal or rescission of the contract
  • Refund of payments and compensation
  • Mortgage, attachment or project financing burden
  • Building completion insurance or other security

Whether the dispute is a consumer transaction, a commercial investment or a general private law relationship may change the court with subject-matter jurisdiction, the mediation requirement and the provisions to be applied.

Title cancellation, registration and transfer

Review of registration claims, acquisition from the contractor, third-party rights, annotations, attachments and mortgages.

Show the scope of services — Title cancellation, registration and transfer

Registration claims arising from a construction contract in return for a land share or from a promise to sell; the position of third parties who acquire an independent unit from the contractor; title deed records, annotations, attachments and mortgages; and the validity of the contract are assessed together.

A transfer made by a contractor who took over from the landowner in the land registry to a third party, or a mortgage it created, is not the same as claims based solely on a promise to sell or on the assignment of a receivable. Within the framework of the unification-of-case-law decision dated May 16, 2025, No. E.2024/1, K.2025/2, the good-faith claim of a third party who acquired a right in rem in reliance on the land registry is assessed. Invalidity or retroactive termination does not mean that the third party’s title will be reversed in every case. Good faith at the time of acquisition and the specific evidence are decisive.

Review the unification-of-case-law decision

Statutory mortgage for construction claims

Conditions of the statutory mortgage for labor and material claims, the registration period and the required title deed procedures.

Show the scope of services — Statutory mortgage for construction claims

For labor or material claims that add value to the immovable property, the conditions of the statutory mortgage right, the registration period, whether the claim has been acknowledged, and the title deed procedures are reviewed. Because the right to registration is subject to a time limit, the timing of the application is also checked separately.

Preservation of evidence and interim protection

Protecting evidence before the works change; interim injunction and precautionary attachment applications as the conditions allow.

Show the scope of services — Preservation of evidence and interim protection

Before the works are covered, the structure changes or a transfer to a third party takes place, preservation of evidence, an on-site examination and an expert review are requested. Where the conditions are met, an application for an interim injunction or a precautionary attachment is made to restrict a title transfer, to protect security, to secure the receivable or to preserve the existing situation.

Preservation of Evidence and Protective Legal Measures

The existing situation in construction can change quickly. Repairing or covering defective works, handing the site over to another contractor or starting to use the building may make it harder to examine the evidence later. For this reason, where necessary, preservation of evidence, an on-site examination and a specialist expert review should be requested from the court before or during the lawsuit.

The questions to be put to the technical panel in the preservation of evidence should be clear:

  • What is the percentage of works carried out?
  • What are the deviations from the contract and the approved project?
  • Which are the incomplete works and which are the defective works, separately?
  • Is the cause of the defect design, material, implementation, supervision or use?
  • What is the method of remedy and its current cost?
  • How can it be determined whether the building is safe and suitable for its intended use?
  • Can it be understood from the technical records which events caused the delay?
  • Are the works included in the progress payment consistent with the actual works?

Where there is a risk of title transfer, cashing in of a letter of guarantee or disposal of assets, an interim injunction and a precautionary attachment are examined separately under their own statutory conditions. The subject of the dispute, approximate proof (yaklaşık ispat), security and proportionality are assessed. Preservation of evidence, on the other hand, is requested according to the conditions of legal interest, such as the risk that evidence may be lost or become harder to obtain later; it does not by itself collect the receivable.

Security and guarantee disputes

Establishing, cashing in or returning bank letters of guarantee, suretyship, mortgages and guarantees.

Show the scope of services — Security and guarantee disputes

Advance payment, final, performance, provisional acceptance deficiency and warranty securities are reviewed together with requests to cash in, return or prevent payment under a bank letter of guarantee. Suretyship, company guarantee, mortgage and assignment of receivable arrangements are structured according to the project risk.

Permits, liability and special projects

Permits, occupancy and municipal procedures

Legal processes concerning the approved project, permits, sealing, demolition, administrative fines and the occupancy permit.

Show the scope of services — Permits, occupancy and municipal procedures

Legal processes concerning the zoning status, permit, approved architectural and engineering projects, renovation permit, construction stop record, demolition, administrative fine and occupancy permit are carried out. The delivery obligation in a private law contract and conformity with municipal and zoning legislation are assessed as separate but connected matters.

Permit, Occupancy, Project and Construction Inspection

A building that appears to conform to the contract may violate zoning and construction legislation; a building with a permit may also lack the qualities set out in the contract. For this reason, the private law obligation and administrative conformity should be examined separately.

In the legal and technical review:

  • Zoning plan and plan notes
  • Zoning status and building conditions
  • Construction permit and its time limits
  • Approved architectural, structural, electrical and mechanical projects annexed to the permit
  • Project amendments
  • Construction inspection records and laboratory results
  • Site manager and contractor records
  • Construction stop record and sealing
  • Administrative fine and demolition order
  • Occupancy permit
  • Transition to servitude of floor ownership and condominium ownership
  • Consistency of the approved project with the actual situation

are assessed. The time limits for administrative applications and annulment actions against municipal or Ministry acts should be followed independently of the private law action.

Construction inspection and technical liability

The areas of fault and liability of the inspection body, project author, site manager and technically responsible persons.

Show the scope of services — Construction inspection and technical liability

The contractual, administrative, legal and, where necessary, criminal liability of the construction inspection body, the project author, the site manager, the responsible technician (fenni mesul), architects and engineers is examined. The separation of project, works and inspection faults through technical experts is ensured.

Architecture, engineering and intellectual property rights

Services, fees, revision, copyright and usage rights in design, supervision, consultancy and project management.

Show the scope of services — Architecture, engineering and intellectual property rights

Project design, supervision, consultancy and project management contracts are prepared or reviewed with respect to the scope of services, revision, copyright and usage rights, professional liability, fees and allegations of fault. Authorship of the project and responsibility for construction are assessed without confusing them with one another.

Infrastructure, facility and renovation works

Energy, tourism and industrial facilities; infrastructure, strengthening, renovation, restoration and demolition works.

Show the scope of services — Infrastructure, facility and renovation works

In infrastructure, energy, tourism facility, factory, strengthening, renovation, restoration and demolition works, a project-specific arrangement is established for permits, technical scope, phasing, protection of the existing building, continuation of operations, delivery and liability; disputes are followed.

Construction and erection insurance

Comparing policy scope, exclusions, notification, damage assessment and payment or recourse claims with the contract.

Show the scope of services — Construction and erection insurance

In construction all risks, erection all risks, third-party liability, professional liability and similar insurance, the scope of coverage, exclusions, notification, damage assessment and the insurer’s payment or recourse claims are reviewed. The consistency of the insurance obligation in the contract with the scope of the policy is checked.

Cooperative and mass-housing projects

Land acquisition, members’ payments and allocation, general assembly, manager liability, delivery and liquidation.

Show the scope of services — Cooperative and mass-housing projects

Disputes in building cooperatives over land acquisition, the project and contractor agreement, members’ payment and allocation rights, general assembly resolutions, manager liability, financial review, delivery and liquidation are handled by assessing cooperative law and construction law together.

Urban regeneration and strengthening

Risky building, owners’ decision, share sale, valuation, eviction, contractor selection and the construction contract.

Show the scope of services — Urban regeneration and strengthening

The determination of a risky building, objection, demolition and eviction, the owners’ decision process, contractor selection, share sale, valuation, a strengthening or reconstruction contract, rent assistance and the routes of application against administrative acts are assessed.

Urban Regeneration, Risky Buildings and Strengthening

In projects under Law No. 6306, the determination of a risky building, objection and finalization; eviction and demolition; the decision majority in proportion to the owners’ shares; the sale process for shares that do not take part in the decision; and valuation, contractor selection and the construction contract must be addressed as a whole.

In an urban regeneration contract, in particular:

  • Existing independent units and land shares
  • The value in the new project and the method of sharing
  • The scope of the majority decision and notification
  • The share sale process and the determination of value
  • The contractor’s financial and technical capability
  • Eviction, demolition and site handover
  • Rent assistance or rent payment by the contractor
  • Permit and delivery schedule
  • Security and controlled title transfer
  • Project change and the features of the independent units
  • The technical and legal feasibility of the strengthening option

should be examined. Because the majorities, notification and sale procedures in the law may change, the legislation in force on the date of the transaction must be verified separately.

Public construction works

Legal support in tender, complaint, progress payment, price adjustment, acceptance, security, debarment and termination processes.

Show the scope of services — Public construction works

In construction works subject to Laws No. 4734 and No. 4735, legal support is provided in the processes of the tender documents, the contract, site handover, work schedule, extension of time, price adjustment, progress payment, provisional and final acceptance, security, debarment and termination of the contract. The current Electronic Public Procurement Platform (EKAP) and construction works legislation is followed separately.

Public Construction Works

Unlike private construction contracts, public construction works are carried out together with the tender documents, Laws No. 4734 and No. 4735, the General Specifications for Construction Works, the current price adjustment regulations and the decisions of the Public Procurement Board (Kamu İhale Kurulu).

Scope of services:

  • Review of the tender documents and the draft contract
  • Disputes over work experience, qualification and bids
  • Complaint and objection complaint applications
  • Site handover and work schedule
  • Increase or decrease in work and new unit price
  • Extension of time and force majeure
  • Price adjustment and additional price adjustment
  • Progress payment and final account
  • Provisional acceptance, final acceptance and warranty period
  • Security, debarment and termination
  • Administrative and judicial court disputes

Because public procurement and contract legislation changes frequently, the date of the transaction and the version of the tender documents should be taken as the basis.

Site accidents and occupational safety

Addressing together the position of the employer and other responsible parties; compensation, SGK recourse and the criminal investigation.

Show the scope of services — Site accidents and occupational safety

In site work accidents, the legal position of the employer, the principal employer, the subcontracting employer (alt işveren), the building owner, the contractor and the technically responsible persons, together with occupational health and safety records, compensation, SGK recourse and the criminal investigation dimensions, is assessed together with the related areas of law.

International matters and dispute resolution

International projects and arbitration

Applicable law, notices, dispute boards and arbitration conditions in FIDIC and other contracts.

Show the scope of services — International projects and arbitration

Projects with foreign parties, FIDIC and similar standard contracts, applicable law, contract language, variation and claims management, dispute boards, mediation, and national or international arbitration processes are carried out.

International Construction Projects and FIDIC Contracts

In international projects, it is not enough for the contract to be prepared only in a foreign language. The applicable law, local mandatory provisions, tax, license, labor, money transfer, security and dispute resolution provisions must be adapted to the country of the project and the financing structure.

Under FIDIC and similar standards, the notice periods, the Engineer’s decisions, variations, extension of time, additional payment claims, dispute avoidance and resolution boards and the arbitration clause are particularly important. Daily site records and contractual notices given on time may carry stronger evidentiary value than a general account prepared after the dispute has arisen.

Güneş & Güneş Law Firm provides contract and legal communication support in Turkish, English, German and Russian.

Enforcement, bankruptcy and composition with creditors

The effect of financial difficulty proceedings on progress payments, title transfer, security, registration of claims and the continuation of the project.

Show the scope of services — Enforcement, bankruptcy and composition with creditors

The consequences of enforcement, bankruptcy or composition with creditors (konkordato) proceedings concerning the contractor, the project owner, the landowner or the project company for the contract, title transfer, security, progress payments and the continuity of the project are assessed. Registration of claims, enforcement, security and liquidation procedures are carried out in connection with one another.

Mediation, litigation and legal remedies

Subject-matter jurisdiction, mediation as a condition precedent to litigation, litigation, appeal, cassation and enforcement of decisions according to the nature of the transaction.

Show the scope of services — Mediation, litigation and legal remedies

Mediation as a condition precedent to litigation and the court with subject-matter jurisdiction are determined according to whether the dispute is commercial, consumer or another private law dispute. Litigation, arbitration, appeal to the regional court of appeal and, where the conditions are met, appeal to the Court of Cassation, together with the enforcement of decisions, are followed. Statutory exceptions, such as disputes arising from in rem rights over an immovable property even where it qualifies as a consumer transaction, are also taken into account separately.

Mediation, Courts and Arbitration in Construction Disputes

The competent authority and the condition precedent to litigation are determined according to the capacity of the parties and the nature of the transaction and the claim. Whether a dispute is considered a commercial case and whether it falls within mediation as a condition precedent to litigation are separate checks; it is not a sufficient explanation that both parties are merchants. There are also statutory exceptions to mediation in consumer transactions; disputes arising from in rem rights over an immovable property are one of them. In the landowner–contractor relationship, jurisdiction and the condition precedent to litigation are determined by examining the contract and the claim together.

In contracts containing an arbitration clause, the scope and validity of the clause, arbitrability, the selection of arbitrators, the seat of arbitration, language and applicable law are examined. Interim legal protections sought from the court are carried out in harmony with the arbitration process.

In mediation, in addition to the payment plan, the completion of incomplete works, the delivery of project documents, title transfer, the return of security, the vacating of the site, mutual release and the enforceability of the settlement should be regulated expressly.

WHEN DETERMINING THE CLAIM AND THE ROUTE TO FOLLOW

Legal distinctions that affect the decision

The type of contract, the capacity of the parties, the delivery status and the evidence affect the right that applies and the application route.

Incomplete work and defective work must be separated

Work that has not been carried out at all or has not been completed is separated from work that has been carried out but does not have the agreed quality. The basis of the claim, the method of remedy, notice and time limits are assessed according to this distinction. Rebuilding the entire construction is not an unconditional right that arises in every case of defect. [K1]

The notice period and the statute of limitations are different

The notification of the defect, the delivery and acceptance records and the time limit for bringing an action are examined separately. A contract for work, a housing sale, incomplete work and gross negligence cannot be reduced to the same rule. That a statute of limitations period has not yet expired does not make it safe to postpone notice of a defect. [K1]

A title transfer may give rise to a third-party right

A title that the contractor has transferred to a third party, or a mortgage it has created, cannot be recovered in every case when the contract ends. The claim that a right in rem was acquired in reliance on the land registry and good faith at the time of acquisition are examined. Claims based solely on a promise to sell or on the assignment of a receivable are assessed separately. [K2]

Progress payment, final account and acceptance are separate

The quantity of work, authorized approval, reservation of rights, deductions and payment documents are read together. An interim progress payment, technical acceptance and the final settlement of accounts do not serve the same function. The effect of signing a document is determined according to the contract and the content of the document.

The permit and conformity with the contract are examined separately

A permit or an occupancy permit does not mean that all contractual obligations have been fully performed. Administrative conformity, technical safety and private law claims are assessed together but under their own rules. For building safety, the review of the relevant technical expert is required.

The scope of mediation and arbitration is checked

Commercial, consumer and general private law disputes may be subject to different procedures. There is an exception to mediation as a condition precedent to litigation for disputes arising from in rem rights over an immovable property that qualify as consumer transactions. In arbitration, the validity of the agreement and the arbitrability of the dispute are also examined separately. [K3]

If there is a notification or an urgent action

If a notification, notice of defects, tender application, title transfer, cashing in of security or the risk of a change in the works is involved, state it at first contact. Submitting a consultation request does not stop statutory or contractual time limits. If there is an urgent danger concerning building safety, an application to the competent technical and administrative authorities should be addressed separately.

HOW A FILE IS HANDLED

Our approach to construction projects

Within the institutional practice maintained since 1999, a construction file is handled in its legal, technical and commercial dimensions. From the review of contract and project risks to the dispute and the implementation of the decision, the work is planned according to the needs of the file.

Not every stage may be necessary in every file. The scope of the consultation, reporting, contract or representation service is determined separately.

  1. Project, parties and priorities

    Land and ownership, company and representation authorities, financing, permit, project and contractor structure are identified. Your capacity as a party, your objective, notifications and upcoming transaction dates are taken into the initial assessment.

  2. Review of the contract and documents

    The main contract and its annexes are compared with respect to technical scope, price, work schedule, progress payment, title transfer, security, defects and termination provisions. The order of precedence of the documents and missing records are identified.

  3. Matching technical and financial findings

    If a review by an architect, civil engineer, mechanical or electrical engineer, valuation expert or financial expert is needed, the questions are framed according to the specific legal claim. Findings on works, fault, quantity and cost are compared with the contract and the approved project.

  4. Choosing the application and resolution route

    Formal notice, preservation of evidence, interim injunction, mediation, litigation or arbitration options are assessed in terms of time limits, subject-matter and territorial jurisdiction, proof and cost. The scope of the work and the services to be undertaken are determined together.

  5. Follow-up of the process and implementation

    While the project continues, contractual notices and claims are followed; in a dispute, expert review, legal remedies and enforcement are followed. The consequences of the settlement or decision for delivery, payment, title and security are addressed separately.

PREPARING FOR A CONSULTATION

Preparation documents for a construction file

Prepare the documents you have and a short timeline of events. Missing items are determined according to the needs of the file.

Contract, parties and title deed

  • Main contract, additional protocols and notarial documents
  • Title deed records, official deed, annotations, mortgages and attachments
  • Sales contracts and third-party transfers

Project and technical records

  • Zoning status, permit, occupancy permit and approved projects
  • Technical specification, room finish schedule, cost estimate and quantity take-off
  • Work schedule and its revisions
  • Construction inspection, laboratory and test records
  • Photographs, video, drone footage and historical satellite imagery

Progress payment and payment

  • Offer, price schedule and cost analysis
  • Progress payments, measurement sheets, final account and invoices
  • Bank payments, securities and accounting records

Correspondence, findings and procedures

  • Site diaries, meeting and delivery minutes
  • Formal notices, KEP, e-mails and lawfully obtained message records
  • Preservation-of-evidence, on-site examination and expert reports
  • Administrative records, fines, demolition and sealing procedures
  • Occupational health and safety and accident records

It should be possible to understand for which contractual provision and legal claim a technical report was prepared, together with the project it is based on, the measurement method, and the fault and cost calculations.

You do not need to send all of your documents in the first message. Confirm the appropriate communication channel before sharing identity, payment and file documents. Review the explanations on secure information and document sharing and personal data protection.

FROM ANTALYA ACROSS TÜRKİYE

Based in Antalya, construction law across Türkiye

Founded in Kemer on March 18, 1999, Güneş & Güneş Law Firm provides services in the contract and dispute processes of land, housing, tourism facility, commercial building and other construction projects. Our physical headquarters has been in Antalya since 2007. Advisory, negotiation, litigation and implementation-of-decision processes in all 81 provinces of Türkiye are carried out according to the conditions of subject-matter jurisdiction, territorial jurisdiction, on-site examination, expert review and representation.

Project location, access to the site, preservation of evidence and the relevant administrative procedures are included in the work plan. Matters that require an on-site technical review are coordinated with the relevant fields of expertise.

International projects connected with Türkiye

For Turkish citizens living abroad, foreign individuals and foreign contractor companies, files connected with Türkiye can be coordinated through online consultation and secure document sharing. The applicable law, international jurisdiction, foreign documents, apostille or certification, translation, notification and the enforceability of the decision are examined separately.

Multilingual communication

Contract and legal communication support is provided in Turkish, English, German and Russian. Transactions that require local authorization in a foreign country are coordinated separately, where necessary, with attorneys authorized in that country.

SCOPE AND COST

Scope of the consultation and fees

At the first consultation, the matter, the current stage, the documents and the request are assessed. If a detailed review, a written opinion, a risk report, contract preparation or a representation service is required, its scope is determined separately.

The attorney’s fee and expenses are explained separately

The fee is agreed by taking into account the nature, scope and stages of the work and the professional regulations in force. Court fees, notification, on-site examination, expert, valuation, translation and other third-party expenses are assessed separately.

A consultation request does not by itself mean that the matter has been taken on or that free advice is being provided. Representation and case handling begin after the necessary assessment and acceptance.

FREQUENTLY ASKED QUESTIONS

Practical questions in construction files

This page provides general legal information. The type of contract, the capacity of the parties, project documents, delivery and payment status, time limits and the specific facts may change the legal result. It does not constitute a legal opinion, or a commitment on time or outcome, for a specific project.

What does a reservation of rights (ihtirazi kayıt) mean?

It is a reservation, made when signing a document, stating that you do not agree with a particular account, deduction or acceptance result. Merely writing “my rights are reserved” may not be sufficient in every dispute. To which item the reservation relates, and within what period and by what method it is to be notified, are assessed according to the contract and the specific document.

Does the price change when costs rise in a lump-sum job?

A cost increase does not by itself mean that the contract price automatically rises. The price provisions of the contract and the effect of unforeseeable circumstances under Article 480 TBK are examined. A general price adjustment calculation cannot be used without assessing the conditions of adaptation, to whom the risk was allocated and the current state of performance.

What should be checked before having incomplete work completed by another contractor?

First, the existing works, faults and deficiencies, the remaining work and the cost should be supported with evidence. Whether a formal notice, the grant of a reasonable period or court permission is required is examined according to the contract, the stage of the work and the legal ground. The routes under Article 113 or Article 473 TBK do not apply in the same way in every case. An urgent safety need is assessed separately.

Is a site report the same as a court expert report?

A technical report obtained by a party does not have the same procedural position as an expert report from an expert appointed by the court. The explanation of the project relied on, the date of inspection, the measurement method and the calculations is important so that both reports can be verified. The submission and assessment of a party’s report are carried out according to procedural rules.

In a FIDIC contract, is the color of the text alone sufficient information?

No. The year of the edition, the particular conditions, annexes, amendments and the applicable law must be seen together with the name of the book. Notice, extension of time, additional payment and the dispute board arrangement may differ according to the version used and the amendments.

Can more than one owner apply together in the same project?

They can; however, whether the rights and claims are common, the possibility of a conflict of interest, representation authorities and each owner’s position in the contract are examined first. Acting together does not mean that all claims or powers of attorney are automatically the same.

Related practice areas

Depending on the nature of the project and the claim, the following areas of law may need to be examined together.

CONSULTATION REQUEST

Let us assess your project or dispute

State briefly your capacity as landowner, contractor, buyer or another party; the location of the project; its current stage; and any upcoming date. The information you share is handled for the assessment of the request and for establishing contact, within the framework of professional confidentiality and the protection of personal data.

For your existing file, you can reach the relevant channels through the Client Center.