Infrastructure and PPP

Legal support on infrastructure and PPP projects, from tender preparation and financial close through construction and operation to handover at the end of the contract.

LEGAL COORDINATION FOR INFRASTRUCTURE PROJECTS

Build the legal framework of the project from the start

Infrastructure and public-private partnership (PPP) law addresses the public law basis of the project, the tender or assignment structure, the project company (SPV), its financing and its contracts together. Legal work aims to align the responsibilities of the parties with the requirements of the public service at every stage of the project.

Güneş & Güneş Law Firm provides legal advice, contract management and dispute resolution services in infrastructure, PPP and project finance processes for investors working with public institutions, sponsors, project companies, financing institutions, contractors, operators and other project parties. The scope of service is determined after conflict-of-interest checks and a review of the public law and private law dimensions of the matter.

Which project parties do we work with?

  • Project developers and sponsors
  • Project companies (SPVs)
  • Domestic and foreign equity investors and infrastructure funds
  • Banks, financial institutions and lending consortiums
  • Export credit agencies and parties working with multilateral financial institutions
  • EPC, design, engineering and turnkey contractors
  • Operation and maintenance service providers
  • Equipment and technology suppliers
  • Insurance and reinsurance parties
  • Contractors working with public institutions, local authorities and public enterprises
  • Consortium and joint venture members

Because the interests of several parties in a project may conflict, a party and conflict-of-interest check is carried out before a matter is accepted.

ALL STAGES OF THE PROJECT

Our scope of services for infrastructure and PPP projects

The scope of review is determined by the stage of the project and the party represented. The nine headings below bring together the services we provide, from model selection and financing to implementation and dispute resolution.

Project preparation and tender

Project model and legal preliminary review

We identify the competent authority, the suitable model and the risks that must be addressed before the tender.

  • Model, authority and legislation
  • Legal status assessment
  • Legal input to feasibility
Show service details — Project model and legal preliminary review

Determining the Legal Model of the Project and the Applicable Regime

The legal consequences of structuring the project as a PPP, a concession, a classic public procurement, a transfer of operating rights, a long-term lease, a revenue-sharing arrangement or another model are reviewed. The competent authority’s powers, required approvals, special laws, public procurement and public finance rules, sector regulations and the judicial route are assessed together.

Choosing a legal model does not replace technical feasibility, financial affordability or public interest analysis. These studies are carried out in coordination with the relevant technical and financial advisers.

[K1]

Project Development, Preliminary Review and Legal Status Assessment

The project land, ownership and use rights, zoning status, licenses and permits, environmental decisions, existing contracts, company structure, financing restrictions and material litigation risks are reviewed. The results of the legal status assessment are reported in a way that shows how risk will be allocated among the parties and which conditions must be completed before financial close.

Feasibility and Pre-Tender Legal Structuring

Before the tender, the legal roadmap of the project, the required administrative approvals, the tender or assignment procedure, a draft risk matrix, the contract package and the timetable are prepared. The legal basis of the revenue model, demand assumptions, service standards, performance indicators, public payments and contingent obligations is assessed.

Tender, joint venture and project company

We review the tender documents, participation requirements and the ownership arrangements of the project company together.

  • Tender and assignment documents
  • Applications and debarment issues
  • Consortium, joint venture and SPV
Show service details — Tender, joint venture and project company

Tender and Assignment Documents

Pre-qualification documents, requests for proposals, administrative and technical specifications, the draft implementation agreement, data room rules, bid bonds, evaluation criteria and clarification processes are reviewed or prepared. Contradictions between documents, disproportionate risk transfer, unclear evaluation criteria, unworkable time limits and provisions that may create a financing obstacle are identified.

Public Procurement Processes and Routes of Challenge

For tenders under Law No. 4734 on Public Procurement, legal review covers bid preparation, qualification criteria, prohibited acts and conduct, exclusion from evaluation, abnormally low tenders, work experience, joint venture structure, invitation to enter into the contract and debarment risks. Because the time limits for a complaint, an objection complaint and judicial applications are short and can have preclusive effect, a separate time analysis is made for each file based on the tender date and the notification records.

Where the PPP project is carried out under a special law or an exceptional regime, the route of application and the competent body are also determined separately.

[K7]

Consortium, Joint Venture and Project Company Structures

Consortium agreements, joint venture arrangements, shareholders’ agreements, incorporation of the special purpose project company, management and veto rights, capital commitments, sponsor support, share transfer restrictions and exit mechanisms are prepared or reviewed. The legal link between tender eligibility and the later establishment of the project company is preserved.

Land, permits and environmental processes

We match site use and the permit schedule with the preconditions for construction and financing.

  • Title deed, allocation and expropriation
  • License, permit and connection
  • Environmental impact assessment (ÇED) and social impact obligations
Show service details — Land, permits and environmental processes

Land, Zoning, Allocation, Easements and Expropriation Processes

The ownership, allocation, lease, easement or use right of the project land, the need for expropriation, the route, the zoning plan, parcelling, the building permit and infrastructure connections are assessed. Any delay in handing over the land must be addressed in the contract in terms of its effect on the construction schedule, cost, financing and the start of revenue.

Expropriation and de facto expropriation issues are addressed in connection with the related standalone practice area and in terms of risk allocation in the project agreement.

Licenses, Permits and Sector Approvals

In sectors subject to regulation, including energy, transport, health, environment, water, waste, telecommunications and others, the required licenses, permits, authorizations, connections and approvals are identified. We determine which permit will be obtained by the public authority, the project company or the contractor; who bears the risk of delay or refusal; and how changes in conditions affect the contract.

Environmental Impact Assessment (EIA), Environmental Permits and Social Impact Processes

The EIA, environmental permits and licenses, public participation, land acquisition, resettlement, biodiversity, cultural heritage and social impact obligations are legally coordinated. If the project uses international financing, additional obligations arising from the environmental and social standards of the lenders, alongside Turkish legislation, are determined.

The EIA report and technical environmental studies are prepared by the competent bodies. Legal services cover the assessment of the applicable procedure, decisions and undertakings, contractual risks, litigation possibilities and financing conditions. Because legislation changes, the current EIA framework is re-checked for each new project.

Contracts and financial close

Project agreement and public payments

We review the responsibilities under the contract, the revenue structure and any public finance commitment.

  • Implementation and concession agreements
  • Tariff, revenue and availability
  • Debt assumption and public finance
Show service details — Project agreement and public payments

Implementation, Concession and Project Agreements

The main project agreement sets out, as one whole, design and construction, financing, land handover, licenses and permits, service standards, the payment or fee mechanism, performance deductions, supervision, insurance, variations, force majeure, changes in legislation, default, early termination, compensation and transfer provisions.

The aim is a lawful balance between the agreement being bankable and the continuity of the public service and the public authority’s supervisory powers.

[K2] [K3]

Public Payments, Revenue and Demand Mechanisms

Availability payments, service fees, tariffs, user revenue, revenue sharing, minimum revenue or demand arrangements and performance deductions are reviewed. Indexation, the foreign currency component, tax changes, set-off, invoicing and payment objection processes are regulated in a clear and calculable way.

A statement that a project has a public guarantee, a Treasury guarantee, a debt assumption or a demand guarantee is made only after it has been verified against the relevant law, decision and signed contract documents.

Debt Assumption and Public Finance Arrangements

Under Law No. 4749 and the related debt assumption arrangements and project-specific approvals, the possibility, scope and conditions of debt assumption are reviewed. Debt assumption is not a general, unlimited or automatic state guarantee applicable to every PPP project. Its applicability is assessed for the specific case in terms of project cost, model, competent authority, external financing and the other conditions set by legislation.

[K6]

Financing, security and creditor rights

We coordinate loan terms, the enforceability of security and the documents for financial close.

  • Loan documents and financial close
  • Security package and priority
  • Direct agreements and step-in
Show service details — Financing, security and creditor rights

Project Finance and Financial Close

Limited-recourse or non-recourse financing structures, syndicated loans, export-credit-supported financing, multilateral financing, capital market instruments such as bonds or lease-certificate-type instruments, and sustainable financing options are assessed legally. The loan agreement, common terms agreement, accounts agreement, intercreditor arrangements, hedging documents and financial close conditions are brought into line with the project agreement.

The financial model, tax calculations and technical forecasts are the responsibility of the licensed or competent advisers concerned; the legal work focuses on how these inputs align with the contracts and the legislation.

Security Package and Creditor Rights

To the extent permitted by the project and the applicable law, rights are structured over pledges of shares, account pledges, assignment of receivables, pledges over movable property, mortgages, sponsor support, letters of guarantee and insurance proceeds. The transfer of rights arising from the public contract, the public authority’s consent, restrictions on public property and the nature of collection accounts are also reviewed separately.

The establishment of security is assessed together with its registration, priority ranking, continuity, adaptation to changes in financing, and enforceability.

Direct Agreements and Creditor Step-In Rights

Direct agreements between the public authority, the project company and the financing parties may cover notice of default, cure periods, the lender’s step-in or substitution rights, share transfers, the appointment of a new operator, and deferral of early termination. These rights are kept consistent with the main project agreement, the financing documents and the company law framework.

[K3]

Construction, operation and insurance

We align the main project agreement with the EPC, operation and maintenance, and insurance arrangements.

  • EPC and inter-contract interfaces
  • Operation, maintenance and lifecycle
  • Insurance and risk transfer
Show service details — Construction, operation and insurance

EPC, Design, Construction and Interface Agreements

EPC, design-and-build, turnkey, supply and subcontract agreements are aligned with the delivery date, performance standard, delay damages, testing and acceptance, defect liability, warranty, price, change and force majeure provisions of the main project agreement. To reduce the “interface gaps” that remain with the project company, the responsibilities of the designer, contractor, supplier and operator are clearly allocated.

Operation, Maintenance and Lifecycle Obligations

Operation and maintenance agreements are reviewed for service level, availability, performance indicators, the maintenance plan, spare parts, staffing, cybersecurity, reporting, audit, interruptions and renewal investments. In long-term projects, not only the initial performance but also the remaining life of the asset at the end of the contract and the handback standard are regulated.

Insurance and Risk Transfer

Construction and erection, third-party liability, business interruption and loss of revenue, professional liability, environmental liability, cyber risk and operating-period policies are reviewed under the project agreement and the financing documents. The use of insurance proceeds, reinstatement obligations, deductibles, additional insureds and lender loss-payee status are regulated.

Implementation, change and disputes

Change, delay and claims

We assess the link between the event and the contract, the notice period and the records that support the claim.

  • Change in law and force majeure
  • Additional work and variation orders
  • Delay, defects and performance deductions
Show service details — Change, delay and claims

Change in Law, Force Majeure and Exceptional Circumstances

The definition and consequences in the contract of events such as a change in legislation or tax, pandemic, natural disaster, war, embargo, supply chain disruption, and currency and price movements are reviewed. Extensions of time, financial rebalancing, tariff or payment adjustments, scope changes and termination rights are tied to clear notice and proof mechanisms.

The existence of adaptation or excessive hardship provisions in the Turkish Code of Obligations does not by itself remove the risk allocation of a long-term project agreement. The applicable law and the language of the contract are considered together.

Variation Orders, Additional Works and Claims Management

Notice, record-keeping, pricing and approval processes are set up for claims arising from changes instructed by the public authority, scope increases, technical standard updates, site conditions, delay, acceleration and additional cost claims. To prevent loss of rights, time limits, daily records, meeting minutes, programme updates and causation evidence are made part of contract management.

Delay, Defects, Performance Deductions and Damages Claims

Delay damages, performance scores, service interruptions, missing work, defects, acceptance tests, and capacity and availability disputes are assessed together with the technical records. The consequences of the same event under the different contracts between the EPC contractor, the project company, the operator, the public authority and the financing parties are managed at the same time.

Compliance, refinancing and change of shareholding

We address changes to ownership and financing through the required approvals, creditor rights and compliance rules.

  • Competition, sanctions and compliance
  • Refinancing and debt restructuring
  • Share transfer and change of control
Show service details — Compliance, refinancing and change of shareholding

Competition, Anti-Corruption, Sanctions and Compliance

Consortium cooperation, information sharing, exclusivity, subcontractor selection and tender conduct are assessed under competition law. Anti-bribery and anti-corruption measures, the prevention of money laundering, international sanctions, conflicts of interest, third-party due diligence and whistleblowing mechanisms are included in the project compliance program.

Refinancing, Restructuring and Change of Control

For debt restructuring, sharing of refinancing gains, changes to maturity and interest, additional borrowing, sponsor change, share transfer, merger or change of control, the required administrative and creditor approvals are identified. The public service character of the project, tender eligibility and debarment provisions are preserved.

Termination, handback and disputes

We review the termination payment, the asset handback standard and the enforceable routes for resolving disputes.

  • Termination and termination payment
  • Handback at contract end
  • Negotiation, litigation and arbitration
Show service details — Termination, handback and disputes

Early Termination, Termination Payment and Handback of the Asset

The procedure and termination payment formula that applies on public authority default, project company default, prolonged force majeure, public interest or other grounds for termination are set out. Outstanding debt, equity, insurance proceeds, compensation, remedial costs and set-offs are assessed according to the formula in the agreement.

During the handover period, a monitoring mechanism must be set up early for the asset condition, remaining economic life, maintenance backlog, staff and contract transfer, data, licenses, spare parts and training obligations.

Prevention and Resolution of Disputes

Project governance, senior-level negotiation, independent expert determination, dispute boards, mediation, judicial or administrative courts and arbitration options are designed for each project. Depending on whether the dispute concerns public law, private law, investment law or several areas, jurisdiction, competence, arbitrability and enforceability are reviewed.

International arbitration or investment arbitration is not an automatic route for every foreign investor. The existence of a valid arbitration agreement, an applicable investment treaty, the definition of investor and investment, waiting periods and other jurisdictional conditions are assessed separately in each case.

[K5]

BEFORE MAKING A DECISION

Points to clarify at the outset of a PPP project

The name of a project does not by itself determine which rules apply. The model, the competent authority, the source of payment and the contractual relationship are assessed together.

The tender regime is determined project by project

Classic public procurement is distinct from a PPP structure in which a private party assumes long-term financing, construction and operation risk. Not every infrastructure tender is a PPP, and not every PPP is subject to the classic tender procedure under Law No. 4734 on Public Procurement. The special law, the competent authority’s powers and the tender or assignment documents are reviewed together. [K1] [K7]

Public payment, guarantee and debt assumption are different things

Availability or service payments, user revenue, demand guarantees and debt assumption are different mechanisms. The presence of one does not imply the others. The legal basis, the authorized decision, the scope and the payment conditions of a public commitment are verified against the documents. [K2] [K6]

Financial close is a process of documents and conditions

Winning a tender or signing the project agreement does not mean that loan drawdown can begin. Financing documents, the establishment of security, permits, insurance and other conditions to drawdown are tracked separately. Signing, closing and post-closing obligations are not mixed on the same list.

Arbitration and the applicable law are not the same question

A valid arbitration agreement and the arbitrability of the dispute under the relevant special legislation are reviewed. For example, Law No. 6428, Article 4/11, requires that Turkish law be applied to the merits of the dispute in the arbitration route it provides. The concession framework under Law No. 4501 and investment arbitration are assessed separately. [K3] [K5]

Claim rights are tracked through records and notices

Additional work, delay, a change in law or force majeure does not automatically result in additional payment or termination. The definition of the event, its impact and causation, the duty to mitigate, the authorized approval and the notice procedure are assessed under the contract.

Handback at the end of operation is planned from the outset

The remaining life of the asset, the maintenance standard, tests, staff and contract transfer, data and licenses, and the handover criteria are defined. If these obligations are addressed only in the last year of the contract, they may give rise to disputes over remediation cost and the termination payment. [K3]

If a tender, notification or closing date is approaching

State the transaction date and the current stage in your first communication. Application and notification time limits vary according to the legislation, the contract, the date of knowledge or the form of notification. A consultation request does not suspend time limits and does not by itself create a representation relationship. Review the matters that require priority attention because of time limits.

PPP MODELS AND THE LEGAL FRAMEWORK BY SECTOR

PPP models in Türkiye

PPP projects in Türkiye are not gathered under a single general PPP law. Depending on the model and the sector, different laws, secondary regulations, administrative decisions and project documents may apply. In legal structuring, the following models in particular are assessed:

Build-Operate-Transfer (YİD/BOT)

Structures in which a private party finances, designs or builds the project, operates it for a fixed period and transfers the relevant asset to the public authority at the end of the contract under agreed conditions. Law No. 3996 and special regulations specific to the project sector may apply. The operating company, the operating period, the fee or tariff, risk allocation, guarantee mechanisms and the transfer standard are set out for each project.

[K2]

Build-Lease-Transfer (YKD/BLT)

Models in which a facility is built by a private party, specified services are provided, and the public authority makes lease or service payments. For PPP applications in the health sector, Law No. 6428 and the related secondary legislation are important. Construction, service areas, performance deductions, financing, lease payments and termination compensation are assessed within the same contract structure.

[K3]

Build-Operate (Yİ/BOO)

In the build-operate model, ownership and operation of the facility may remain with the private party. Law No. 4283 applies to thermal power plants owned by generation companies for electricity production; hydroelectric, geothermal, nuclear and other renewable energy plants fall outside the scope of that Law. For that reason, not every energy investment can be characterized as a build-operate project under Law No. 4283. Licensing, sales and connection arrangements and financing documents are reviewed together under the relevant sector legislation.

[K4]

Transfer of Operating Rights (İHD/TOR)

Models in which the ownership of an existing public asset stays with the public authority while the right to operate it is granted to a private party for a specified term and under specified conditions. The scope of the transfer, the investment obligation, tariffs, performance, maintenance, staff, the condition of the asset and the handback obligations at the end of the contract must be set out in detail.

[K1]

Concessions and Other Contractual Structures

Concession agreements for the provision of public services, authorizations based on municipal and sector legislation, long-term lease or revenue-sharing structures, and hybrid models may also arise depending on the characteristics of the project. What determines the legal classification is not the name of the contract but the authority of the public party, the nature of the public service, the risk assumed, the source of payment, asset ownership and the termination mechanism.

[K5]

Model names indicate the general framework only. The public authority’s powers, the current special legislation, decisions and approvals, the source of payment, asset ownership and the tender documents are checked separately for each project.

PREPARATION, IMPLEMENTATION AND REPORTING

Our working approach to PPP projects

The tender, project agreement, financing and implementation documents are handled within a single framework of risk and responsibility. The review is planned to show which work will be done, by whom and by which date.

The working team and reporting arrangements are set according to the project’s sector, size, number of parties, language and timetable. Technical, financial and environmental advisers are coordinated where needed, and their professional roles and responsibilities are kept separate.

  1. Party and Conflict-of-Interest Check

    Information about the public authority, the sponsor, the project company, the financing party, the contractor and the operator is collected to determine whether there is a representation conflict.

    At this stage, the method for transferring confidential project documents is also agreed.

  2. Project and Authority Map

    The model, sector, administrative basis, tender regime, contract structure, financing structure, judicial route and critical dates of the project are identified.

    A list of documents to be reviewed, responsible persons and critical dates is prepared.

  3. Risk and Document Review

    Material risks are classified by likelihood, impact, responsible party, contractual response and recommended action. Technical and financial matters are coordinated with the relevant advisers where needed.

    The effect of the risks on the contract, the permit schedule and the financing conditions is reported together.

  4. Negotiation and Implementation

    Contract amendments, closing conditions, guarantees, permits and corporate decisions are managed through a task and closing list.

    Open issues and their owners are recorded; signing, closing and post-closing items are kept separate.

  5. Construction and Operation Period Monitoring

    Notice, change, claim, performance and compliance obligations are reviewed at set intervals. The effect of changes in legislation on the project is assessed.

    The reporting frequency and the persons to whom matters requiring a decision are escalated are set according to the scope of the work.

  6. Dispute Strategy

    Negotiation, a technical expert, a dispute board, mediation, litigation or arbitration options are determined by taking account of cost, time, enforceability, the continuing working relationship and the state of the evidence.

    Required notices, evidence preservation and time limits are planned together with the chosen route.

Review and working outputs by project stage

  1. 1. Project idea and pre-feasibility

    Key legal questions
    Does the authority have the power, which model may apply, and which approvals are required?
    Typical work outputs
    Legal map, note on model options, preliminary risk matrix
  2. 2. Feasibility and structuring

    Key legal questions
    Can the revenue and payment structure be set up legally, and is the project bankable?
    Typical work outputs
    Legal status assessment, contract architecture, permit and land roadmap
  3. 3. Tender and bid

    Key legal questions
    What are the risks of eligibility, consortium, bid, security and applications?
    Typical work outputs
    Legal review of the bid, clarification questions, joint venture documents
  4. 4. Preferred bidder

    Key legal questions
    How will the project company, the shareholders and the main agreement be aligned?
    Typical work outputs
    SPV documents, shareholders’ agreement, negotiation list
  5. 5. Financial close

    Key legal questions
    Are the loan and security package consistent with the project agreement?
    Typical work outputs
    Financing documents, direct agreements, list of closing conditions
  6. 6. Construction

    Key legal questions
    How will delay, change, site and cost claims be protected?
    Typical work outputs
    Contract management protocol, notice and claim files
  7. 7. Operation

    Key legal questions
    How will performance, payment, maintenance and changes in legislation be managed?
    Typical work outputs
    Compliance calendar, KPI and deduction review, change requests
  8. 8. Termination and handback

    Key legal questions
    What is the termination payment and the asset handback standard?
    Typical work outputs
    Handback plan, asset condition review, closing and dispute strategy

SECTOR-SPECIFIC REVIEW

Which infrastructure projects do we provide legal support for?

Transport and logistics, energy, health, water and waste management, ports, digital infrastructure, education and urban service projects can bring together the continuity of the public service and the capital, technology, construction and operating capacity of the private sector within a single structure. Because of long preparation periods, high investment amounts, many parties and multi-year contractual relationships, these projects differ from a classic construction contract or a single-stage public procurement.

Transport and Logistics Infrastructure

For road, bridge, tunnel, railway, rail system, airport, port, marina, logistics center, border and customs facility projects, the competent authority, route and land, user fees, traffic or volume risk, safety standards, the construction interface and operating performance are reviewed together.

Energy and Energy Transition

For electricity generation, transmission and distribution; natural gas and pipelines; and renewable energy, storage, charging and energy efficiency projects, licensing, connection, land, offtake or service agreements, EPC, financing and environmental obligations are coordinated.

Health and Social Infrastructure

For health campuses, hospitals and support services, as well as education and other social infrastructure projects, the review covers construction, lease or service payments, performance deductions, the limits of clinical services, facility management, equipment, data security and the continuity of the public service.

Water, Waste and Environmental Infrastructure

For drinking water, wastewater, treatment, solid waste, recycling and circular economy projects, the powers of municipalities and sector bodies, tariffs, offtake guarantees, environmental permits, performance standards, and land and user relationships are addressed.

Digital and Critical Infrastructure

For fiber networks, data centers, smart city, public cloud, telecommunications and digital public service projects, licensing, service levels, data localization, personal data, cybersecurity, system continuity, source code and technology dependency risks are reviewed.

Urban Infrastructure and Municipal Projects

For public transport, parking, markets, social facilities, energy efficiency, lighting and municipal service projects, the powers of the local government, the tender or authorization model, budget and payment, tariffs, use of real estate and audit mechanisms are assessed.

FROM THE MAIN AGREEMENT TO SUBCONTRACTS

How are contracts and risks managed together?

Preparing the main project agreement alone is not enough for a project to reach financial close successfully and to be carried out predictably throughout the contract term. The tender documents, the project company and shareholding arrangements, direct agreements, credit and security documents, EPC and operation and maintenance contracts, land and permit processes, the insurance program, the revenue or availability mechanism, the performance regime, the change and compensation events, and the termination and handback provisions must be aligned with one another.

In the risk matrix, the responsible party, the relevant contract provision, the measure to be taken, the required approval and the follow-up date are shown together. Where a risk assumed in the main agreement has no counterpart in a subcontract, this is flagged separately.

Core Contract Structure in Project Finance

In an infrastructure project, the following documents should be reviewed not one by one but in light of the priority and risk transfer between them:

  • Implementation, concession, delegation or main project agreement
  • Tender and bid documents
  • Project company articles of association and shareholders’ agreement
  • Capital commitment and sponsor support documents
  • Loan, common terms and intercreditor agreements
  • Direct agreements and step-in right arrangements
  • Account, cash flow and reserve account agreements
  • Pledge, mortgage, assignment of receivables and other security documents
  • EPC, design, engineering and supply agreements
  • Operation, maintenance and lifecycle agreements
  • Land, lease, allocation, easement and connection documents
  • Insurance program and reinsurance arrangements
  • Hedging and currency risk documents
  • Licenses, permits and environmental decisions
  • Handover, acceptance and asset condition protocols

Key Risk Allocation Headings

In infrastructure contracts, if risk is not clearly allocated to the party able to manage it, cost, time and financing problems grow. The main risks are:

  • Land acquisition, expropriation and site handover
  • Design, ground conditions and unforeseen physical conditions
  • Licenses, permits, connections and public approvals
  • Securing financing and financial close
  • Exchange rate, interest rate, inflation and refinancing risk
  • Construction period, cost overrun, delay and acceptance testing
  • Demand, usage, tariff and collection risk
  • Availability, performance and service quality
  • Changes in legislation and tax
  • Force majeure, political events and embargo
  • Environmental and social obligations
  • Cybersecurity and continuity of critical systems
  • Insurability and use of insurance proceeds
  • Early termination and termination payment
  • Transfer of the asset at contract end and its remaining life

The risk matrix should be prepared before the tender and applied in the same direction in the main project agreement and in the subcontracts.

Contract Management Before Disputes Arise

In PPP and infrastructure projects, much of the loss of rights arises not only on the merits but because notice is not given on time, records are not kept, an unauthorized person gives approval, or the claims procedure in the contract is not followed. For this reason, it is useful to set up a contract management protocol at the start of the project.

At a minimum, the following matters should be included in this protocol:

  • Who gives notices, to which address and within what time
  • Daily site records, progress reports and meeting minutes
  • Authority to approve change orders and additional work
  • Critical path and programme updates
  • Retention of cost and causation records
  • Reporting among the public authority, contractor, operator and financing party
  • Reservation of rights and staged presentation of claims
  • Mandatory steps before moving to a dispute board or arbitration

CRITICAL DATES

In which situations does a review take priority?

  • Running of the time limit for an application against a tender document or tender decision
  • Risk of the bid security being forfeited or of debarment
  • Approaching financial close date
  • Receipt of a default, termination or step-in notice
  • Delay in site handover, expropriation or permits
  • Issue of a variation order or performance of additional work
  • Notice of force majeure or change in legislation
  • Availability interruption or payment dispute
  • Suspension or cancellation of an EIA, license or permit
  • Risk of breach of the loan agreement or enforcement of security
  • Need for change of control, refinancing or restructuring
  • Dispute over the termination payment or handback standard

A general time period should not be relied on before the time calculation, the contract provision and the form of notification have been examined in the specific file.

PREPARING FOR THE FIRST CONSULTATION

Documents needed for an infrastructure and PPP project

At the first stage a short project summary is sufficient. The documents needed for a detailed review are determined according to the party represented and the stage of the project.

Project, tender and joint venture

  • Tender notice, pre-qualification and request for proposal documents
  • Draft or signed project agreement and its annexes
  • Bid, clarification letters and the authority’s responses
  • Consortium, joint venture and shareholder documents

Financing, site and permits

  • Legal assumptions of the financial model and the payment mechanism
  • Loan and security documents
  • EPC, O&M and key supply agreements
  • Land, title deed, allocation, zoning and expropriation documents
  • EIA, environmental permits, sector licenses and permits

Implementation and dispute records

  • Insurance policies and claim records
  • Default, notice, variation order and claim correspondence
  • Work programme, progress reports, acceptance and test records
  • Dispute board, mediation, litigation or arbitration documents

How should confidential documents be shared?

Do not include confidential project documents in your first message to the firm. A secure transfer method for project agreements, financing documents, trade secrets and files containing personal data is determined after the party and conflict-of-interest check.

Secure Information and Document Sharing · Protection of personal data

ANTALYA-BASED LEGAL SERVICE

Projects across Türkiye and cross-border projects with links abroad

Güneş & Güneş Law Firm was founded in Kemer on March 18, 1999, and has been based in Antalya since 2007, with more than 27 years of institutional history. Taking into account the nature of the project and the contractual relationship, the competent court or arbitral tribunal, and the procedural rules that apply to negotiation, tenders and contract implementation, the firm provides legal services in advisory work, contract negotiation, tender processes, dispute resolution, arbitration and the enforcement of decisions across the 81 provinces of Türkiye.

Foreign investors and financing parties

Legal work on Türkiye-linked infrastructure, PPP and project finance relationships of foreign investors, financing institutions and foreign companies based outside Türkiye can be carried out through online consultation, secure document sharing and multilingual communication. In every file involving a foreign element, the applicable law, international jurisdiction, arbitration and choice-of-law clauses, use of foreign documents, apostille or certification, translation, service abroad, recognition and enforcement, and the enforceability of a decision are reviewed separately.

Communication in four languages and file coordination

The firm carries out legal processes related to infrastructure projects, PPPs and project finance for individuals and companies located in different countries around the world, to the extent the file requires, with communication available in Turkish, English, German and Russian. The physical office in Antalya and the legal services linked across Türkiye and internationally are planned taking into account the jurisdiction, competence, time limits, evidence and representation conditions of each file.

Work that requires local law or a power of representation in a foreign country is coordinated, where necessary, with attorneys authorized in that country.

ENGAGEMENT AND SCOPE OF SERVICES

Initial consultation, scope and fees

At the initial consultation, we clarify the party’s status, the project model, the sector, the competent public authority, the stage, the upcoming dates and the work requested. Detailed document review, written opinion, contract negotiation, closing follow-up and dispute representation are each scoped separately.

Legal services do not replace technical feasibility, engineering, financial modeling, valuation or the preparation of an EIA report. Where these are needed, they are coordinated with the competent advisers.

Fees and third-party costs

Attorney fees are agreed by taking into account the scope of the work, its stages, the volume of documents, the language and the applicable professional regulations. Third-party costs, such as court fees, arbitration or expert costs, notary, translation, travel and technical advice, are explained separately.

A consultation request does not include a free report or a commitment to a specific response time. Acceptance of the matter depends on agreement about the conflict-of-interest check, the service terms and the required authorization.

FREQUENTLY ASKED QUESTIONS

Questions about infrastructure, PPP and project finance

The information below is general in nature and does not constitute a legal opinion or a promise of outcome. The sector, the chosen model, the competent public authority, the tender documents, the financing structure and the contract terms are assessed on the basis of the specific project.

Model and project company

What is a public-private partnership?

A public-private partnership is a project model in which one or more elements of the design, financing, construction, operation and maintenance of a public service or infrastructure asset are undertaken by a private party under a long-term contract and a risk-sharing framework. The scope and payment structure of each PPP differ.

Is there a single PPP law in Türkiye?

No. The PPP field in Türkiye rests on model-based and sector-based regulations. Build-operate-transfer, build-lease-transfer, build-operate, transfer of operating rights and concession models may be subject to different laws and secondary regulations.

Is every infrastructure tender a PPP project?

No. A classic procurement of goods, services or works financed from the public budget and a PPP model in which the private party assumes long-term financing and operating risk are different legal structures. The applicable regime is determined from the tender documents and the legal basis.

Why is a project company established in a PPP project?

A project company can be used to bring together the tender obligations, financing, and the construction and operation contracts at project level and to separate cash flows. The transfer of shares, management, capital and insolvency risks of the company should be arranged in line with the main project agreement.

What is project finance?

In project finance, repayment of the loan depends mainly on the future revenue and cash flow of the project. Lenders review the project’s contracts, permits, risk allocation, security and the termination payment together. The scope of sponsor recourse and support obligations varies according to the financing documents.

Financing and foreign participation

Are government or revenue guarantees automatic in PPP projects?

No. A public guarantee, a demand or revenue arrangement, and debt assumption can exist only where the relevant legislation, the competent decision or the contract documents expressly provide for them. These concepts should not be used interchangeably.

Is debt assumption the same as a Treasury guarantee?

Each mechanism may have different legal conditions and consequences for public finance. The applicability of debt assumption is reviewed under Law No. 4749, the secondary regulation, the project model and the approvals; it cannot be interpreted as a general guarantee.

What is a step-in right for lenders?

Step-in refers to contractual rights that financing parties may hold in certain default situations to remedy the project before it ends, take temporary intervention, or propose a suitable replacement contractor or operator. Its scope is set by the direct agreement and the main project agreement.

Can foreign investors take part in a PPP project in Türkiye?

Foreign investors may take part, directly or through a joint venture, to the extent the tender and sector conditions allow. Company formation, tender eligibility, sector permits or approvals, financing, tax, sanctions and investment protection provisions are reviewed together. The presence of foreign capital does not by itself mean that a separate general investment permit is required for every investment.

Can foreign law be chosen in a project agreement?

The validity of a choice of law depends on the public service character of the contract, mandatory provisions, the parties and the applicable legislation. The same result may not follow for a public contract, a financing document and subcontracts.

Applications, arbitration and changed circumstances

Can arbitration be used for PPP disputes?

Where a valid arbitration agreement exists and the dispute is arbitrable, arbitration may come into question. Concessions, international commercial arbitration, investment arbitration and domestic arbitration each have separate rules on jurisdiction and validity.

How is a tender decision challenged?

The route of challenge depends on whether the tender is subject to Law No. 4734 on Public Procurement, to the special PPP legislation or to another regime. For complaints and objection complaints under Law No. 4734, the applicant’s standing, the form, the time limits and the electronic procedure to be used are checked separately. Administrative routes that must be exhausted before court proceedings in the relevant tender process should not be overlooked. Time periods should not be calculated before the dates of learning, notification and the act are seen.

Why does an EIA decision matter for a project?

An EIA and environmental permitting process can affect whether the project can begin, the financial close conditions, the construction timetable and litigation risk. The technical report is prepared by a competent body; legal review focuses on the procedure, undertakings, permits, contract and dispute aspects.

Does a change in legislation automatically change the project price?

No. The definition of the change, whether it is general or project-specific, its financial effect, its predictability, the notice period and the rebalancing mechanism in the contract are reviewed. The contract and the applicable law are assessed together.

Do the parties’ obligations end in a force majeure event?

Not always. The definition of force majeure, the duty to prevent and mitigate, notice, extension of time, financial consequences, and the right to terminate in the case of prolonged force majeure are determined by the contract.

Termination and first review

How is the termination payment calculated?

The formula may vary according to the reason for termination. Senior outstanding debt, equity, expected return, remedial cost, insurance proceeds, compensation and set-offs are assessed under the method in the agreement. There is no single, general calculation method.

What is handback or end-of-contract transfer?

It is the transfer of the project asset to the public authority at the end of the contract in a specified physical condition, with a specified performance and remaining-life standard. Inspection in the final years, the maintenance reserve and a remediation plan should be regulated in the contract.

When should legal review begin?

The most effective time is before the project model and tender documents are settled. Targeted review may also be carried out at the tender, financial close, construction, operation, refinancing, default or transfer stages.

What information is needed for an initial assessment?

A short description of the project’s sector and location, the parties, the competent public authority, the model, the tender or contract stage, key dates, the financing status and any current dispute may be shared. Confidential documents should not be included in a message to the firm before a secure transfer method has been agreed.

Can applications be made from outside Türkiye or from other provinces?

Yes. Acceptance of a file depends on the nature of the project, the competent body, the need for physical procedures, language, timetable and the conflict-of-interest assessment. Online meetings and secure document sharing may be used; no inference should be drawn that the firm has an office in every province.

INITIAL REVIEW OF YOUR PROJECT

Let us define the scope of legal work together

In a short summary, please state the sector and location of the project, the competent public authority, your status as a party, the tender or contract stage, the financing position and the upcoming date. If there is a dispute and the work you expect, please describe them; do not attach confidential project files to your first message.

Information is handled in the context of professional confidentiality and the protection of personal data, for the purpose of assessing the request and communicating with you. For communication about an existing file, you may use the Client Center channel.